Application Type |
Planning Board Fee |
|
Subdivision |
$850
(per lot to be developed) application fee/$5,000 recreation fee (per lot to
be developed) |
|
|
$200
application fee |
|
Site
Plan |
$500
application fee/$.20 per sq. ft. of new building construction (gross area, per floor) |
|
Site
Development Plan |
$350
application fee (in the case of a subdivision, $350 shall be provided for
each lot to be developed) |
|
Special
Use Permit |
$500
application fee |
|
Major
Grading Permit |
$300
application fee (in the case of a subdivision, this fee shall cover the
entire project and will not be charged for each new lot) |
|
Public
Hearing Fee |
$200
(this fee shall cover all simultaneous public hearings) |
|
Inspection
Fee |
5%
of the cost of all required improvements
(case-by-case basis) |
Notes:
1.
Each application requires a public hearing. A $200
public hearing fee is required and shall be provided to the Planning Board
Clerk prior to the hearing.
2.
If an applicant requires two or more of the
above-mentioned approvals, the applicant is responsible for the fees associated
with each application; however, when public hearings are conducted
simultaneously, only one public hearing fee will be charged.
3.
The recreation fee associated with a multi-family
development shall be 3,000 per dwelling unit.
4.
Amendments to previously approved plans/permits
shall require a new application and associated fees.
Planning Board Escrow Funds
|
Application Type |
Escrow Amount |
|
Subdivision |
$4,000 |
|
|
$1,000 |
|
Site
Plan |
$3,000 |
|
Site
Development Plan |
$2,000 |
|
Special
Use Permit |
$2,000 |
|
Major
Grading Permit |
$1,000 |
|
Construction
Monitoring Escrow |
$2,500
(in the case of a subdivision, $2,500 shall be provided for each lot to be
developed) |
Notes:
1.
The Town employs the services of outside
consultants, as needed, in the review of Planning Board applications. Project
applicants are required to reimburse the Town for the fees of said consultants,
and an escrow account will be established and maintained for the payment of
such fees upon receipt of a project application. The account will be maintained
and supplemented, as needed, throughout the review process and, where
appropriate, during monitoring after project approval.
2.
The above indicated escrow amounts do not account
for multiple reviews by any Town consultant.
3.
The above indicated escrow amounts do not reflect
the escrow required to review or prepare certain SEQRA documents (i.e. scoping
document/DEIS/FEIS/Finding Statement).
4.
If an applicant requires two or more of the
above-mentioned approvals, the applicant is responsible for the escrow
associated with each application.