BUILDING DEPARTMENT – 2009 FEES

 

EVALUATION:

 

RESIDENTIAL

COMMERCIAL

1.  Dwellings:  One and Two Family

 

$ 100.00 Sq. Ft.

 

 

2.  Multiple Family:

 

 

            a. Apartments, Hotels, Motels

 

$200.00 sq. ft.

            b. Boarding Houses, Nursing and

 

 

                     Convalescent Homes

 

$200.00 sq. ft.

3.  Garages:  Unattached or Attached

$ 60.00 Sq. Ft.

 

4.  Accessory Buildings, Utility Buildings,

 

 

                      Finished Basements

$ 45.00 Sq. Ft.

 

5.  Docks/Porches

$ 30.00 Sq. Ft.

 

6.  Mercantile/Commercial

 

 

            a.  Buildings, Office Buildings

 

 $200.00 sq. ft.

            b.  Garages and Service Stations

 

 $200.00 sq. ft.

            c.  Places of Public Assembly

 

 $200.00 sq. ft.

            d.  Assembly Halls and Clubhouses

 

 $200.00 sq. ft.

7.  Re-Inspection Fee (when inspection is

 

 

            Called for and is not ready

$ 50.00

$100.00

8.  Commencing of Work

$ 50.00

$100.00

9.  Rock Hammering: First 10 days

                                   Renewable – 10-day

                                          Intervals (max.30    

                                          Days)

 

FEES FOR ABOVE EVALUATIONS

$250.00

 

$250.00 (per 10-day period)

 

RESIDENTIAL

$350.00

 

$350.00 (per

10-day period)

 

COMMERCIAL

Up to $1,000.00

$ 45.00

$100.00

For each additional $l,000 or fraction up to and

 

 

             Including $20,000.

$ 11.00

$  22.00

For each additional $1,000 or fraction and

 

 

            Including $100,000.

$ 10.00

$  20.00

For each additional $1,000 or fraction

 

 

            Excluding $100,00.

$   9.00

$  18.00

Demolition Fee

 

$250.00

Demolition Fee

$100.00

$500.00

Blasting

Oil Tank Removal or Installation

$100.00

$  60.00

$250.00

$100.00

                             

ADDITIONAL FEES:

 

RESIDENTIAL

 

COMMERCIAL

1.  a,  Inground Swimming Pools

$   80.00

 

b.     Above Ground Swimming Pools

c.      Renewal after first year

$   45.00

$   250.00

 

2.  Plumbing:

 

 

          a.  For Five (5) Fixtures

$   50.00

 

          b.  Each Additional Fixture

$   12.00

 

3.  Approved Earth Products Removal

$   100.00 + ..50

 

          (After approval by Planning Board

     Per cubic yd.

 

4.  Tennis Courts

$   200.00

 

5.     Building Permit Renewal Fee

Failure to renew by expiration date will result in a charge of $50.00 being added to permit fee.

Half Original Fee (2nd  Year)

Minimum Fee $45.00 Full Fee Thereafter

 

6.  Renewal – Conversions Special Use

$   125.00

 

7.  Certificates of Occupancy Search or

           Non-Conforming Letter

 

$     80.00

 

8.   Addition charge for work begun on                   Principal Structure without first

obtaining a permit.

 

$    300.00* Plus fee         


$500.00* plus fee

9.  Additional charge for work begun on   alteration or construction of accessory buildings without first obtaining a fee.

 

$    300.00*(Plus  regular fee.

 

10. Site Inspection to verify conformity.

 

$   150.00

 

11.  Bedroom Count

$   150.00

 

12.  Forestry Practice Application Fee

 

$50.00 per acre

13.  Minor Grading Permit

$   150.00

 

14.  Towers 

 

 

 

a.      Additional Equipment (On Towner)   Already Approved by Planning Board

 

 

       b.   Utility Buildings

$   2,500;00 per linear foot in height (evaluation)

 

$   800.00 Per Item

 

 

 

 

$    200.00 Sq. Ft.

(evaluation)

 

 

15.  Well Permits

$      50.00

 

Public Utilities and Domestic Services

 

 

 

$   2,500.00 Special Use Permit

 

 

SEQRA ESCROW FUNDS

 

As required, the amount based on the scope of the project.

 

 

 

 

WETLANDS FEES

Wetlands Escrow

Additional Escrow Fees may be needed as determined by the Wetlands Inspector.

 

Wetlands Application/Inspector Fee

 

 

 

 

 

Screening

 

Violation Fee:

 

 

 

Minor Subdivisions, Development Approval Plans, Special Use Permits

 

Major Subdivision, Site Plans

 

Wetland Screening:

 

 

 

$500.00

 

 

$200.00 to cover one-hour time

 

$50.00 Processing Fee

 

$100.00

 

Double the Wetlands Application/Inspector Fee

 

$1,000.00

 

 

$2,000.00

 

$100.00 plus $10.00 for each acre over five acres

 

FENCE FEES

 

Fence Permit

 

 

 

$45.00

 

UNREGISTERED VEHICLES

 

          Towing

 

 

$95.00

 

          Processing Fee

$50.00

 

          Storage Fee

$12.00 per day

 

              

CLICK HERE TO RETURN TO PREVIOUS PAGE.