Application Type |
Planning Board Fee |
|
Subdivision |
$850 (per lot to be
developed) application fee/$5,000 recreation fee (per lot to be developed) |
|
Lot Line Realignment |
$200 application fee |
|
Site Plan |
$500 application fee/$.20
per sq. ft. of new building
construction (gross area, per floor) |
|
Site Development Plan |
$350 application fee (in
the case of a subdivision, $350 shall be provided for each lot to be
developed) |
|
Special Use Permit |
$500 application fee |
|
Major Grading Permit |
$300 application fee (in
the case of a subdivision, this fee shall cover the entire project and will
not be charged for each new lot) |
|
Public Hearing Fee |
$200 (this fee shall cover
all simultaneous public hearings) |
|
Inspection Fee |
5% of the cost of all
required improvements
(case-by-case basis) |
Notes:
1.
Each application requires a public hearing. A $200
public hearing fee is required and shall be provided to the Planning Board
Clerk prior to the hearing.
2.
If an applicant requires two or more of the
above-mentioned approvals, the applicant is responsible for the fees associated
with each application; however,
when public hearings are conducted simultaneously, only one public hearing fee
will be charged.
3.
The recreation fee associated with a multi-family
development shall be 3,000 per dwelling unit.
4.
Amendments to previously approved plans/permits shall
require a new application and associated fees.
Planning
Board Escrow Funds
|
Application Type |
Escrow Amount |
|
Subdivision |
$4,500 |
|
Lot Line Realignment |
$1,000 |
|
Site Plan |
$5,000 |
|
Site Development Plan |
$3,500 |
|
Special Use Permit |
$2,000 |
|
Major Grading Permit |
$1,000 |
|
Construction Monitoring
Escrow |
$2,500 (in the case of a
subdivision, $2,500 shall be provided for each lot to be developed) |
Notes:
1.
The Town employs the
services of outside consultants, as needed, in the review of Planning Board
applications. Project applicants are required to
reimburse the Town for the
fees of said consultants, and an escrow account will be established and
maintained for the payment of such fees upon receipt
of a project application. The
account will be maintained and supplemented, as needed, throughout the review
process and, where appropriate, during
monitoring after project approval.
2.
The above indicated
escrow amounts do not account for multiple reviews by any Town consultant.
3.
The above indicated
escrow amounts do not reflect the escrow required to review or prepare certain
SEQRA documents (i.e. scoping
document/DEIS/FEIS/Finding Statement).
4.
If an applicant requires two or more of the
above-mentioned approvals, the applicant is responsible for the escrow
associated with each application.
CLICK HERE TO RETURN TO PREVIOUS PAGE.